138th Street Improvements | Reconfiguration of reverse curb into a single curve for safety improvements and paving of the corridor. | Active/Under Construction | District 3 | | Road Repair | More Info |
34th Street SW - Water Main Interconnect | Water main interconnect between existing mains to provide looping redundancy. | Completed | District 5 | | Utilities | More Info |
A1A Service Road | This project reconfigures the entrance to offstreet parking on SE Dixie Highway. Currently, traffic enters from Bridge Road and travels south with angled parking available from Bridge Road to Venus Street, which requires crossing eastbound Bridge Road traffic. | Completed | District 3 | Hobe Sound | CRA/OCD | More Info |
Abandonment of North Surficial Wells 1-3 | Properly plug and abandon three surficial water wells located in Jensen Beach. | Completed | District 1 | | Utilities | More Info |
Administration Office Parking Lot | Replacement of parking lot at the Administration Office. | Completed | District 2 | | Miscellaneous | More Info |
Airport Directors Office/Liberator Medical on Airport Road | Pull fiber into existing conduit to support all western Airport sites (Directors Office, Liberator Medical, Old Community Coach, proposed Customs Facility. | Completed | District 2 | | Community Broadband Network Fiber | More Info |
Airport Security System Extension for Gate 8A at Old Radio Services | Connect proposed Gate 8A and Pedestrian Gate at Former Sheriff's Hanger/Radio Services to fiber security network to Gate 8-10. | Completed | District 2 | | Community Broadband Network Fiber | More Info |
Airport Wildlife Plan | | Proposed/Pending Grant Award | District 2 | | Airport | More Info |
All American Blvd at SW St. Lucie Shores | This project involves replacement of the existing 15” diameter corrugated metal pipe with 15” diameter reinforced concrete pipe on SW All American Blvd at SW St Lucie Shores Drive. The project is expected to take 3 weeks to complete. This work requires intermittent lane closures, and motorists should anticipate potential delays. | Completed | District 5 | | Stormwater | More Info |
All American Ditch Water Quality Improvement Project | The project proposes to install a water quality weir, fill and grade a portion of All American Ditch to divert runoff to a proposed pipe system that will convey the flows south to a ~30 acre Lake / Stormwater Treatment Area (STA), configured in a treatment train system. | Completed | District 5 | | Stormwater | More Info |
Artificial Reef Construction 2013 | To foster a thriving environment below sea, the Coastal Engineering Department works cooperatively with a wide range of public and private organizations. The Martin County Artificial Reef Program represents such a partnership. The Artificial Reef Program brings together various government organizations, educational institutions, sportfishing and diving enthusiasts, and interested citizens to create artificial reef environments that provide habitats for fish and other marine organisms.
| Completed | District 1 District 2 District 3 District 4 District 5 | | Coastal | More Info |
Artificial Reef Construction 2014 | The project consists of construction and deployment of at least 3,500 tons of secondary use concrete material. These reef materials consist mainly of large concrete culverts, junction boxes and similar large clean concrete structures. These materials are to be deployed in seven (7) patch reefs within the South County permitted reef area in the Atlantic Ocean offshore. To foster a thriving environment below sea, the Coastal Engineering Department works cooperatively with a wide range of public and private organizations. The Martin County Artificial Reef Program represents such a partnership. The Artificial Reef Program brings together various government organizations, educational institutions, sportfishing and diving enthusiasts, and interested citizens to create artificial reef environments that provide habitats for fish and other marine organisms. | Completed | District 1 District 2 District 3 District 4 District 5 | | Coastal | More Info |
Artificial Reef Construction 2016 Sirotkin Reef | To build a new Artificial Reef to create a dive reef trail in the Sirotkin Reef site. Which will connect the already existing Tetrahedron Reef "Black" to the Concrete Railroad Tie Stack Reef. | Completed | District 1 District 2 District 3 District 4 District 5 | | Coastal | More Info |
Artificial Reef Construction 2016 South County Reef | To foster a thriving environment below sea, the Coastal Engineering Department works cooperatively with a wide range of public and private organizations. The Martin County Artificial Reef Program represents such a partnership. The Artificial Reef Program brings together various government organizations, educational institutions, sport fishing and diving enthusiasts, and interested citizens to create artificial reef environments that provide habitats for fish and other marine organisms. | Completed | District 1 District 2 District 3 District 4 District 5 | | Coastal | More Info |
Automatic Meter Read (AMR) Replacement | 3200 meters are being replaced per year throughout the County. | Active/Under Contruction | District 1 District 2 District 3 District 4 District 5 | | Utilities | More Info |