All American Ditch Water Quality Improvement Project

The project proposes to install a water quality weir, fill and grade a portion of All American Ditch to divert runoff to a proposed pipe system that will convey the flows south to a ~30 acre Lake / Stormwater Treatment Area (STA), configured in a treatment train system.

Dept:
PWD
District:
District 5
Status:
Completed
Project Type:
Stormwater
Project Number:
1244
Current Status:
Punchlist in progress; Substantially complete
Project Contact:
Greg Nolte, 221-2380
Construction Start Date:
2016-08
Construct. % Complete:
100%
Construction End Date:
2017-12
Design Start Date:
2015-01
Design End Date:
2016-02
Division:
Ecosystem Restoration & Management
Project Coordination:
SFWMD, FDEP