This project involves replacement of the existing 15” diameter corrugated metal pipe with 15” diameter reinforced concrete pipe on SW All American Blvd at SW St Lucie Shores Drive. The project is expected to take 3 weeks to complete. This work requires intermittent lane closures, and motorists should anticipate potential delays.